Southwest Pier to Harbour Basin is a Grade II listed building in the Ceredigion local planning authority area, Wales. First listed on 25 September 1986. Dock structure. 1 related planning application.
Southwest Pier to Harbour Basin
- WRENN ID
- tilted-lintel-khaki
- Grade
- II
- Local Planning Authority
- Ceredigion
- Country
- Wales
- Date first listed
- 25 September 1986
- Type
- Dock structure
- Source
- Cadw listing
Description
The Southwest Pier to Harbour Basin is a Grade II listed structure made of coursed rubble. It runs southeast from a beacon and continues beyond the corner with the Quay into a lower round-ended jetty. There is a lower rubble protective wall at the top of the concrete pier, along with two flights of steps leading down to the water level.
Additionally, the coursed rubble quay extends southwest from the corner with the pier, situated in front of the Aberaeron Yacht Club, and angles northwest towards the slipway.
More on this building
Sign in or create a free account to unlock:
- Full EPC report — heating system, energy costs, size, glazing, construction etc.
- No sale records on file
- Related listed building consents — 1 application
- Detailed attributes — period, style, materials, features
- Flood risk assessment
- Radon risk assessment
Matched applications, energy data and sale records are assembled automatically and may contain errors. Flag incorrect data.