Blairgar Byewash (Former Glasgow Corporation Water Works) is a Grade B listed building in the Stirling local planning authority area, Scotland. First listed on 18 August 2008. Waterworks.
Blairgar Byewash (Former Glasgow Corporation Water Works)
- WRENN ID
- hidden-jamb-russet
- Grade
- B
- Local Planning Authority
- Stirling
- Constituency
- Stirling and Strathallan MP: Chris Kane (Lab)
- Country
- Scotland
- Date first listed
- 18 August 2008
- Type
- Waterworks
- OS grid reference
- NS 532 826
- Coordinates
- 56.01382, -4.35615
- Source
- Historic Environment Scotland listing
Description
Blairgar Byewash, formerly part of the Glasgow Corporation Water Works, was designed by John F Bateman in 1856. This roughly rectangular and symmetrical masonry enclosure is situated on a sloping site, with walls that step down the hillside. At the eastern end, there is a bowed projection, and to the west, there are masonry retaining walls that lead to the outflow channel. The outer face is made of bull-faced snecked red sandstone, while the inner face features polished ashlar. The structure is topped with rounded copes.
Inside, there is a central cast-iron trough that carries a conduit between arched openings, which are accented by prominent voussoirs. Shallow steps are located on each side of the trough, and there is an entrance gate above the southern arch. The masonry structure is designed to direct the burn to flow underneath the conduit at right angles.
Local climate
Blairgar Byewash (Former Glasgow Corporation Water Works) sits in one of the wettest parts of the UK, with an average of 1,430 mm of rain a year. This makes it wetter than 98% of listed buildings in the UK. Its exposure to wind-driven rain is greater than that of 85% of listed buildings.
It experiences an average of 53 freeze-thaw cycles a year, more than 94% of listed buildings. Of these, 31 follow at least 1 mm of rain in the preceding 48 hours. Average temperatures at this location have risen by 0.3°C per decade since 1991.
Averages for 1991–2020; temperature trend 1991–2025. Figures describe the wider area (a grid cell of roughly 10 km), not the individual site. Contains modified Copernicus Climate Change Service information 2026.
More on this building
Sign in or create a free account to unlock:
- No EPC on record for this property
- No sale records on file
- No related consent applications matched
- Detailed attributes — period, style, materials, features
- Flood risk assessment
- Radon risk assessment
- Weather exposure and heating demand — rain and frost month by month and year by year, wind direction, solar and humidity
Matched applications, energy data and sale records are assembled automatically and may contain errors. Flag incorrect data.
Similar buildings
The closest matches to this building from all 493,000 UK listed buildings, by architecture, period and materials.
- 1 Blairquhosh Byewash (Former Glasgow Corporation Water Works)
- 2 Ballewan Byewash 3 (Former Glasgow Corporation Water Works)
- 3 Ballewan Byewash 1 (Former Glasgow Corporation Water Works)
- 4 Ballewan Byewash 2 (Former Glasgow Corporation Water Works
- 5 Railings And Gates (Former Glasgow Corporation Water Works), Lettre Byewash And Access Chamber With Boundary Wall
this building 1 similar nearby listed buildings
Nearby listed buildings
- Blairquhosh Byewash (Former Glasgow Corporation Water Works)
- Duntreath Castle
- Ballewan Aqueduct Bridge (Former Glasgow Corporation Water Works), Spittal Glen
- Moss
- Ballewan House
- Railings And Gates (Former Glasgow Corporation Water Works), Lettre Byewash And Access Chamber With Boundary Wall
- Ballewan Byewash 1 (Former Glasgow Corporation Water Works)
- Ballewan Byewash 2 (Former Glasgow Corporation Water Works
- Drumwhirn, Drumbeg Loan, Killearn
- Ballewan Byewash 3 (Former Glasgow Corporation Water Works)