Paint Stores and Electroplating Shop is a Grade II listed building in the Ashford local planning authority area, England. Shop.
Paint Stores and Electroplating Shop
- WRENN ID
- night-rotunda-stoat
- Grade
- II
- Local Planning Authority
- Ashford
- Constituency
- Ashford MP: Sojan Joseph (Lab)
- Country
- England
- Type
- Shop
- Address
- Paint Stores and Electroplating Shop, Newtown Road, South Willesborough & Newtown
- OS grid reference
- TR 018 414
- Coordinates
- 51.13717, 0.8838
- Source
- Historic England listing
Description
The Paint Stores and Electroplating Shop, built around 1865 for the South Eastern Railway, is a single-storey building located at Newtown Railway Works. Constructed of yellow brick with a Welsh slate roof, it features a central glazed louvre. The building measures approximately 12.2 meters by 8.9 meters and is divided into two units by a brick party wall.
The north elevation originally had four tall, round, rubbed-brick headed windows set in rectangular recesses, but the first and third windows from the left have been converted into doors. The south elevation also had tall round-headed windows in rectangular recesses, which are now blocked, along with three tall arches on the east and west elevations that lack recesses. A later lean-to has been added to the west elevation. The roof is plain with a central raised glazed louvre on the ridge.
The interior was not inspected in July 1998 but is reported to have a central dividing wall and iron roof trusses. The building first appears on the 1871 Ordnance Survey map as a paint store and was later used as an electroplating shop. It was designed to be semi-fireproof, making it suitable for storing combustible and gaseous materials like paint. This building is notable as the only early structure on the Ashford works site with fire-resistant features. The metal trusses are constructed from cast iron struts and wrought iron plates, with some joints being wedged rather than bolted, indicating an early date of construction.
It is listed for its group value within the early railway works layout and for its unique design features as a paint store within the locomotive establishment.
Local climate
Paint Stores and Electroplating Shop sits in a drier-than-average part of the UK, with an average of 740 mm of rain a year. This makes it drier than 76% of listed buildings in the UK. Its exposure to wind-driven rain is greater than that of 71% of listed buildings.
It experiences an average of 19 freeze-thaw cycles a year, fewer than 81% of listed buildings. Of these, 10 follow at least 1 mm of rain in the preceding 48 hours. Average temperatures at this location have risen by 0.3°C per decade since 1991.
Averages for 1991–2020; temperature trend 1991–2025. Figures describe the wider area (a grid cell of roughly 10 km), not the individual site. Contains modified Copernicus Climate Change Service information 2026.
More on this building
Sign in or create a free account to unlock:
- No EPC on record for this property
- No sale records on file
- No related consent applications matched
- Detailed attributes — period, style, materials, features
- Flood risk assessment
- Radon risk assessment
- Weather exposure and heating demand — rain and frost month by month and year by year, wind direction, solar and humidity
Matched applications, energy data and sale records are assembled automatically and may contain errors. Flag incorrect data.
Similar buildings
The closest matches to this building from all 493,000 UK listed buildings, by architecture, period and materials.
this building 1 similar nearby listed buildings