Building 80 (Workshops and Parachute Store) is a Grade II listed building in the South Cambridgeshire local planning authority area, England. First listed on 1 December 2005. Workshop, store. 3 related planning applications.
Building 80 (Workshops and Parachute Store)
- WRENN ID
- gentle-cloister-fern
- Grade
- II
- Local Planning Authority
- South Cambridgeshire
- Constituency
- South Cambridgeshire MP: Pippa Heylings (LD)
- Country
- England
- Date first listed
- 1 December 2005
- Type
- Workshop, store
- Address
- Building 80 (Workshops and Parachute Store), Duxford
- OS grid reference
- TL 459 461
- Coordinates
- 52.09474, 0.12968
- Source
- Historic England listing
Description
Building 80, a carpenters’ workshop and dope shop, was constructed in 1917 by the War Office's Directorate of Fortifications and Works. The building is rectangular in plan, consisting of two parallel gabled ranges. It has painted brickwork walls and piers, and low-pitched corrugated iron roofs, which were originally slate. The south elevation features twelve 16-pane steel casements, with two doorways positioned off-centre, one of which has been partially blocked. The north elevation is similar, and the twin-gabled end elevations each have four 12-pane steel casements, except for one later 20th-century window in the north-east gable, along with plank double doors. Internally, the building has timber trusses supported by iron tension rods. Duxford represents the finest and best-preserved example of a fighter base from the period up to 1945 in Britain, and includes a uniquely complete group of First World War technical buildings. The Training Depot Station at Duxford is the most complete WWI airfield grouping in Britain; it was initiated in 1917 and involved the largest airfield construction programme of the First World War, used for training pilots for service overseas. The workshops are among several specialist buildings characteristic of these sites, including engine repair shops, technical stores, and plane stores.
Local climate
Building 80 (Workshops and Parachute Store) sits in one of the driest parts of the UK, with an average of 700 mm of rain a year. This makes it drier than 93% of listed buildings in the UK. Its exposure to wind-driven rain is lower than that of 76% of listed buildings.
It experiences an average of 34 freeze-thaw cycles a year, fewer than 52% of listed buildings. Of these, 16 follow at least 1 mm of rain in the preceding 48 hours. Average temperatures at this location have risen by 0.3°C per decade since 1991.
Averages for 1991–2020; temperature trend 1991–2025. Figures describe the wider area (a grid cell of roughly 10 km), not the individual site. Contains modified Copernicus Climate Change Service information 2026.
More on this building
Sign in or create a free account to unlock:
- No EPC on record for this property
- No sale records on file
- Related listed building consents — 3 applications
- Detailed attributes — period, style, materials, features
- Flood risk assessment
- Radon risk assessment
- Weather exposure and heating demand — rain and frost month by month and year by year, wind direction, solar and humidity
Matched applications, energy data and sale records are assembled automatically and may contain errors. Flag incorrect data.
Similar buildings
The closest matches to this building from all 493,000 UK listed buildings, by architecture, period and materials.
this building 1 similar nearby listed buildings